NEWS
    GUANGZHOU TONGXIN SPORTS EQUIPMENT CO.,LTD.
    — 新闻中心 —
     

    The first public announcement of the environmental impact report of the new project of Tongxin (Gaoming) Sports Industrial Park

    Number of views:2301 Date:2019-04-29

    New project of Tongxin (Gaoming) Sports Industrial Park
    First publicity of public participation in environmental impact statement



    In April 2019, Guangdong Tongxin Industrial Co., Ltd. entrusted Foshan Environmental Engineering Equipment Co., Ltd. to prepare the environmental impact report of the project. According to the law of the people's Republic of China on environmental impact assessment, the measures for public participation in environmental impact assessment and other relevant provisions, the construction unit shall, within 7 working days after determining the preparation unit of the environmental impact statement, make a public announcement on the basic situation of the proposed project to the public. For this reason, the environmental impact statement of the new project of Tongxin (Gaoming) sports industrial park is hereby released to the public The first publicity of public participation.

    一、Summary of construction project

    The new project of Tongxin (Gaoming) sports industrial park is located in xiaodongbei, Genghe Town, Gaoming District, Foshan City. It is mainly engaged in the production of prefabricated environmental friendly rubber floor and solventless water curable polyurethane resin. The project is a new construction project with a total floor area of 54002.03 square meters and a total building area of 34743.08 square meters. There are 300 employees in the factory. The main products and scales are: 4 million square meters of prefabricated environmentally friendly rubber runway (Stadium) roll, 200000 square meters of environmentally friendly commercial rubber floor, 200000 square meters of environmentally friendly domestic rubber floor, 100000 square meters of high-performance and safe bearing floor mats Square meters, 200000 square meters of environmentally friendly and breathable rubber floor, 5000 tons of polyurethane a component and 5000 tons of polyurethane B component.

    2、 Name and contact information of the construction unit

    Employer: Guangdong Tongxin Industry Co., Ltd
      Project contact: Liu Junjie
      Tel: 13928705702
      Mail: xm@tx1993.com
      Mailing address: second floor, office building, No. 532, Industrial Avenue, Genghe Town, Gaoming District, Foshan City, 528500.


    3、 Name and contact information of EIA organization
    EIA unit: Foshan Environmental Engineering Equipment Co., Ltd
    Project contact: Miss Yan
    Tel: 0757-81851212
    Mail: jingwen0757@163.com
    Mailing address: 818, Tian'an innovation building, No. 1, Jianping Road, Guicheng Street, Nanhai District, Foshan City, China.

    4、 Working procedures and main contents of environmental impact assessment
    Through the investigation of the natural and social environment around the project and the assessment of the current situation of the environmental quality, we can understand the current situation of the environmental quality in this area; according to the production characteristics of the project, we can analyze the environmental impact factors of the construction project, collect the public opinions and suggestions; propose the pollution prevention and control measures of the project, predict the impact on the surrounding environment after the implementation of the project, give the assessment conclusions, and provide relevant information for the government Provide basis for department decision-making.

    5、 Scope and main issues for public opinion
    Mainly solicit the public's attitude towards the project construction and major environmental issues of concern, as well as relevant opinions and suggestions.

    6、 Main ways of public opinions
    Within 10 working days from the date of publication of this announcement, the public can express their opinions and opinions on the construction and environmental impact assessment of this project by telephone, email and letter through the contact information of the construction unit and the assessment unit.
    See the attachment for the public participation survey opinions of the project.



                                                   Guangdong Tongxin Industry Co., Ltd

                                                        April 25, 2019


    Category: Company news